Facing soft soil and high-cost equipment challenges for a North Sea semi-sub drilling operation, our client needed a solution that balanced cost, reliability, and operational safety. We conducted a detailed analysis to optimise wellhead and conductor designs for the site’s unique conditions, enabling early procurement and significant cost savings.

By recommending the pre-installation of a Conductor Anchor Node (CAN), we mitigated soft soil risks, reduced rig downtime, and ensured operations proceeded on schedule. Early involvement allowed the client to de-risk the project, improve efficiency, and maintain performance standards even in challenging conditions.

Key outcomes: Cost savings, reduced risk, improved efficiency, and timely procurement.