Discover how Aquaterra Energy helped a UAE operator extend the life of more than 60 ageing offshore wells while optimising conductor designs for a future drilling campaign. By combining conductor integrity analysis with smarter well design, the project reduced material usage, lowered carbon emissions and delivered significant cost savings without compromising performance.

Read the full case study to learn how we:

  • Established minimum wall thickness requirements for ageing wells.
  • Optimised conductor size, grade, thickness and setting depth for a planned drilling campaign.
  • Enabled targeted intervention planning and reduced integrity risk.
  • Extended the productive life of existing offshore assets.
  • Delivered significant steel savings and reduced carbon impact across the campaign.
  • Assessed the integrity and remaining life of 60+ offshore production and injector well conductors.