Successful tiebacks start long before offshore installation begins. Over five years, Aquaterra Energy supported Shell’s Crux development offshore Australia, from early feasibility and concept studies through to pre-drilling planning, detailed tieback engineering, equipment supply and offshore installation support. The campaign culminated in the connection of five pre-drilled subsea wells to a fixed production platform in approximately 200m of water.
Download the full case study to learn how we:
- Supported the project across five years of engineering, from feasibility and concept selection through to pre-drilling planning and tieback execution.
- Helped manage well positioning, conductor verticality and installation tolerances to support the subsequent tieback campaign.
- Used laser-based LiDAR survey data and detailed engineering studies to refine tieback lengths, alignment requirements and installation strategies ahead of offshore execution.
- Supplied over 50 centralisers, alongside cement top-up systems and offshore installation support, for the five-well campaign.
- Supported the first platform tieback of its kind in Australia, connecting pre-drilled subsea wells to a fixed platform using a Hydraulic Workover Unit, with all tiebacks installed within tolerance.