Discover how Aquaterra Energy helped de-risk a 12-well offshore development in Vietnam by assessing conductor drivability and connector fatigue before installation. The analysis identified critical risks early, enabling the operator to select the most appropriate installation method and avoid potential downtime, equipment damage and safety concerns.

Download the full case study to learn how we:

  • Predicted conductor penetration depth under varying soil conditions.
  • Assessed fatigue performance of multiple connector designs.
  • Identified potential installation risks before execution.
  • Supported a critical change in installation methodology.
  • Reduced uncertainty, operational risk and potential downtime.