Every time you pay by card, stream a film or ask an AI tool a question, somewhere, a data centre does the work. Demand for data centres is growing faster than ever, but so is the resistance to building them. 

In this first part of The Offshore Shift, I’ll explore why data centres have become so critical, what’s driving their rapid growth, and why the onshore infrastructure needed to support them is becoming an increasingly urgent challenge. Later in the series, I’ll ask whether taking some of that infrastructure offshore could be part of the answer. 

 

  1. What a data centre actually does

At its simplest, a data centre is a building full of computers. Servers process and store data, supported by the infrastructure needed to keep them running: grid connections, uninterruptible power supplies, backup generators and cooling systems. 

Because servers generate significant heat and need an uninterrupted power supply, keeping them cool and powered is a central engineering challenge for any data centre. 

What relies on them? Almost everything digital: financial transactions, emergency response, cloud storage, streaming, email and, increasingly, AI.  

Most of us only notice this infrastructure when it stops working. Earlier this month, a Microsoft networking fault disrupted services including Outlook, Teams and Copilot across more than 70 countries, even affecting banks and airlines. This showed just how dependent everyday life has become on digital infrastructure. And that dependence is only growing, as cloud computing, digital services and AI expand, the data centres underpinning them are becoming as critical as the services themselves. 

 

  1. Why demand is growing so fast

Follow the money. Data centres are now one of the world’s major infrastructure investment markets. According to the International Energy Agency (IEA), the capital expenditure of five large technology companies, largely on data centres, surged to more than $400 billion in 2025 and is set to increase by a further 75% in 2026. That is now larger than global investment in oil and natural gas production.  

The same shift is visible closer to home. Barbour ABI estimates the UK data centre construction pipeline is approaching £100 billion, with annual spend on new UK data centres forecast to reach £10 billion by 2029. Not every project in a pipeline will be built, but the direction of travel is hard to miss, and across Europe a further €176 billion of cumulative data centre investment is expected between 2026 and 2031. 

The power figures follow the same trend. The IEA expects global data centre electricity consumption to almost double, from 485 TWh in 2025 to 950 TWh in 2030, equivalent to more than three times the UK’s current annual electricity consumption. 

AI is a major part of that trajectory. Although individual tasks are becoming more efficient, rapid adoption and increasingly energy-intensive applications continue to drive overall demand. In the UK, the Government is targeting a 20-fold increase in sovereign compute capacity by 2030. 

 

  1. The problem with putting them onshore

Land: As data centres grow in capacity, their physical footprint grows too, requiring more land. Meta’s Hyperion campus in Louisiana has been described as eventually reaching four times the size of New York’s Central Park. 

Proximity: Data centres have traditionally clustered around major population and connectivity hubs. In Europe, most capacity is concentrated in and around five hub cities: Frankfurt, London, Amsterdam, Paris and Dublin. But as facilities become larger and place greater demands on land and infrastructure, development is increasingly moving further afield.  

Power and grid capacity: The rapid growth of data centres is adding pressure to already constrained electricity grids. In Great Britain, the queue of demand projects contracted to connect rose from 41 GW to 125 GW between November 2024 and June 2025, driven largely by data centres. The IEA also highlights large data centre pipelines across the US and Europe, warning that in several regions the combined capacity of data centres waiting to connect exceeds current peak demand. 

Water and cooling: National water use may appear relatively modest, but consumption can be highly concentrated. In England, the six largest users account for 65% of the sector’s potable water consumption, with demand potentially peaking on hot days when local supplies are already under pressure. The challenge isn’t just how much land, power or water data centres use. It’s the scale and speed of demand, concentrated in locations where existing resources are already under pressure.  

These are increasingly infrastructure and engineering problems, not simply technology problems, which raises the question of whether established offshore engineering expertise could offer some of the answers. 

 

  1. Why communities are pushing back

In the US, local opposition has become a serious constraint, with Data Center Watch reporting that at least 120 projects were blocked or delayed during the first half of 2026 amid concerns over utility bills, water consumption, noise, property values and the loss of green space. The UK and Europe may be earlier in the cycle, but similar concerns are emerging. Here in Norfolk, plans for a £1.2bn data centre near Norwich have also attracted local scrutiny. These concerns deserve a proper answer, not a dismissal. A data centre is a large, concentrated load that can require new generation and grid investment. It is not unreasonable to ask who foots the bill and what it means for water supply during a heatwave. 

So, if demand continues to grow, where do we put the infrastructure needed to meet it? 

 

  1. When offshore engineering meets big tech

Some of the best engineering happens when two industries meet. 

In 2018, Microsoft set out to test whether a data centre could run on the seabed, working with offshore and marine specialists to build, deploy and monitor it off Orkney. Its cooling system even used a heat-exchange process found on submarines. 

Project Natick ran 864 servers, sealed 117 feet below the surface for two years. When the module was retrieved in 2020, its servers had shown a failure rate 87.5% lower than a land-based control group.  

That was a proof of concept, and interest in the concept is now growing. Aegir Insights identified eleven new offshore data centre concepts announced in the six months to August 2026, each meeting the same offshore realities of structure, installation, power, access and a design life measured in decades. These are problems the offshore engineering industry solves every day. 

At Aquaterra Energy, we’ve already taken our offshore experience into new territory. We’ve engineered a minimal-facilities, unmanned platform concept for CO2 injection, designed to run predominantly on hybrid wind, solar and battery power. We’ve also delivered a platform powered entirely by solar energy, and we design platforms for rig-based installation, without the need for a separate heavy-lift vessel. 

It’s a different payload, but the engineering questions are the same: what is the leanest approach that does the job? Should the system be on the seabed, at the surface or somewhere in-between? How do you install and power it, maintain it and run it with no one on board? 

 

Coming next 

In part two, I’ll explore why offshore data centres make more sense than you might think: space without taking anyone’s land, natural cooling, power at source, the potential to reduce some grid and planning constraints, and what the pioneers have already proved. 

Follow us on LinkedIn so you don’t miss it. 

 

Sources  

Aegir Insights, Offshore Data Centers: The Five Archetypes, August 2026 – Offshore data centers: The five archetypes, and why the timelines deserve scrutiny | Aegir Insights [https://ww…ta-centers] 

Al Jazeera, Microsoft 365 Outage, 13 November 2026 – Microsoft hit by global outages: What happened and why? [https://ww…ed-and-why] 

Barbour ABI via Construction News, 27 August 2026 – More than £100bn of data centre construction planned in UK | Construction News [https://ww…7-08-2026/] 

Capacity, 833 Opposition Groups, One Global Pattern, 24 September 2026 – Why data centre resistance looks so different by country [https://ca…y-country/] 

Data Center Watch (US): 

Q1 2026 Report – Q1 2026 Report [https://ww…rg/q1-2026] 

Q2 2026 Report – Q2 2026 Report [https://ww…rg/q2-2026] 

Data Centre Watch (UK), accessed 18 November 2026 – Data Centre Watch UK [https://da…ewatch.uk/] 

Ember, Grids for Data Centres in Europe, June 2025 – Grids for Data Centres in Europe [https://em…s-ai-race/] 

EMEC, press release, 15 September 2020 – Microsoft share findings following data centre trials at EMEC [https://ww…s-at-emec/] 

European Data Centre Association, State of European Data Centres 2026 – State of European Data Centres 2026 [https://ww…download=0] 

IEA, Energy and AI, April 2025 – Energy demand from AI – Energy and AI – IEA [https://ww…nd-from-ai] 

IEA, Key Questions on Energy and AI, April 2026 – Key Questions on Energy and AI – IEA [https://ww…rgy-and-ai] 

IEA, Overcoming Energy Constraints Is Key to Delivering on Europe’s Data Centre Goals, November 2025 – Overcoming energy constraints is key to delivering on Europe’s data centre goals – IEA [https://ww…ntre-goals] 

Meta, Richland Parish Data Center – The largest Meta data center yet brings big impact to Louisiana – Meta Data Centers [https://da…ta-center/] 

Microsoft, Microsoft security incident management: Post-incident activity, Microsoft Service Assurance – Microsoft security incident management: Post-incident activity – Microsoft Service Assurance | Microsoft Learn [https://le…t-activity] 

Microsoft Research, Project Natick – Project Natick – Microsoft Research [https://na…osoft.com/] 

Offshore Energies UK, Business Outlook Report 2026 – Business Outlook Report 2026 | Offshore Energies UK (OEUK) [https://oe…port-2026/] 

Ofgem, Demand Connections Reform Call for Input, February 2026 – Demand Connections Call for Input [https://ww…-Input.pdf] 

Ofgem, press release, 29 July 2026 – Ofgem acts to free up grid capacity by tackling speculative data centre projects [https://ww…e-projects] 

TechCrunch, 14 July 2025 – Mark Zuckerberg says Meta is building a 5GW AI data center | TechCrunch [https://te…ta-center/] 

techUK and the Environment Agency, Understanding Data Centre Water Use in England, August 2025 – New report sheds light on commercial data centres’ water usage in England | techUK [https://ww…in-england] 

UK Government, Digest of UK Energy Statistics (DUKES), 2026 – DUKES 2026 Chapters 1-7 [https://as…rs_1-7.pdf] 

WRc / MOSL Strategic Panel, Data Centre Potable Water Use in England, 2026 (via Data Centre Review) – New report calls for mandatory reporting on water use | Data Centre Review [https://da…a-centres/] 

Yahoo News, Delia Smith joins opponents of £1.2bn data centre, 2026 – Delia Smith joins opponents of £1.2bn data centre